Charging starts with connection capacity, vehicle dwell time and the role each charger must serve.

Follow the complete project flow
Choose a stage or scroll from the first site review through handover and support.

01
Connection capacity check
We check available connection capacity, parking layout and charging demand before defining the system.

02
Charger selection: AC or DC
AC or DC is selected around dwell time, charging speed and how the site will use the chargers.

03
Groundwork and power supply
Cable routes, protection, mounting positions and required groundwork are prepared before installation.

04
Installation and commissioning
The chargers are mounted, connected, configured and tested as part of the approved site solution.

05
Maintenance and support
After handover, maintenance and support continue for the installed charging equipment.